Construction of 90 pre-1994 housing stock in the former R293 towns within eThekwini Municipality regions
Public buyer: Ethekwini Metropolitan Municipality
12
days left
Closes Friday, December 11, 2026 at 11:00
Get the corrigenda and an alert before it closes.
- Publication date
- November 12, 2026
- Place of performance
- KwaZulu-Natal
- Procedure
- Request for Bid(Open-Tender)
Similar tenders
- COMPLETION CONTRACT FOR THE CONVERSION OF MVABA HIGH SCHOOL INTO A FULLY FLEDGED TECHNICAL HIGH SCHOOL IN INANDA NORTH, ETHEKWINI DISTRICT MUNICIPALITY, KWAZULU NATAL
Deadline: February 8, 2027
- Refurbishments and rehabilitations to Sicelokuhle Secondary School in Uthukela District, KwaZulu-Natal
Deadline: February 15, 2027
- PANEL OF SERVICE PROVIDERS FOR THE SUPPLY AND INSTALLATION OF FENCING MAINTENANCE FOR THE PERIOD OF 3 YEARS (36 MONTHS) IN KWA-ZULU NATAL PROVINCE IN VARIOUS SCHOOL DISTRICTS
Deadline: December 17, 2026
- CONSTRUCTION OF SPORT FIELD PHASE 2 IN WARD 2
Deadline: December 10, 2026
- THE CONVERSION OF THE OLD SABS BUILDING INTO A SECURITY CONTROL FACILITY AT THE RICHARDSBAY TERMINALS FOR TRANSNET SOC LTD (REG.NO 1990/000900/30) OPERATING AS TRANSNET PORT TERMINALS (HEREINAFTER REFERRED TO AS “TPT”), AS A ONCE OFF.
Deadline: December 15, 2026
- The Playhouse Company invites bids for the supply, install and paint one standard drywall partition, 8.0 m long × 2.5 m high, with one double wooden door, at the Sound Department, The Playhouse Company, Durban. The works include: • Setting out, lightweight steel stud framing, fixing to floor, soffit and abutting walls • Flexible sealing at all perimeters • Gypsum plasterboard to both faces, taped, jointed and finished ready for paint • Framed opening, hardwood door frame, pair of solid-core wooden doors and ironmongery • Priming and painting both wall faces; sealing and varnishing the doors, frame and architraves • Protection of the existing building, daily clean-up, removal of waste, and handover All work must comply with SANS 10400 (National Building Regulations), the board and framing manufacturer's installation guide, and the Employer's site rules. Noisy work is to be scheduled around rehearsals and performances as agreed with the venue.
Deadline: December 4, 2026
For members
Everything you need to decide and bid — in one place.
Buyer contacts
Department, email and phone of the person in charge.
Tender documents
Rules, specifications, bill of quantities — ready to download.
Official tender link
The notice on the public portal, to get the documents and bid.
AI tender analysis
Eligibility, risks, financing and timeline, in a few minutes.
Do not miss the deadline or a corrigendum
Create your free account: an alert before the deadline, the buyer’s contacts and the official link. AI analysis is available with credits.
See the contacts and the official link