LiveCreate free account
Back
Open🇲🇦 MoroccoServicesStudies & Consulting

Technical study for the construction of four tracks in the commune of Ait Imour: 1) Track connecting RP 2007 and Douar El Kohlane (L=02 km). 2) Track connecting Imam Chafiai school and the limit of Agafay commune (L=4.600 km). 3) Track connecting Douar Janane Lakbir and Douar El Ghaba Zouitate (L=3 km). 4) Track connecting RP 2007 and Douar Sadra (L=3.800 km). Technical study for the construction of a structure at the intersection of Oued Ouirmane and a canal, located at Douar Ait Ali Moussa (approximate length 60 meters).

Original title: *Etude Technique Relative Aux Travaux De Construction De quatre Pistes sur Territoire De La Commune Ait imour : 1)La Piste Reliant RP 2007 Et Douar El Kohlane Sur L=02 Km. 2)La Piste Reliant collège imam chafiai Et la limite de La Commune Agafay Sur L= 4.600Km. 3)La Piste Reliant Douar janane Lakbir Et Douar el Ghaba zouitate sur L=3Km. 4)La Piste Reliant RP 2007 Et Douar Sadra sur L=3.800Km. * Étude Technique Relative Aux Travaux De Construction D’un Ouvrage D’art Au Niveau De L’intersection De Oued Ouirmane Et D’une Séguia, située au Douar Ait Ali moussa (Longueur approximative de 60métres)

Public buyer: Municipality of Ait Imour

5

days left

Closes Monday, November 30, 2026 at 11:00

Get the corrigenda and an alert before it closes.

Alert me before it closesFree, no credit card.

208 similar tenders open

Publication date
November 24, 2026
Place of performance
Marrakech
Procedure
Purchase Order

Similar tenders

For members

Everything you need to decide and bid — in one place.

Buyer contacts

Department, email and phone of the person in charge.

Official tender link

The notice on the public portal, to get the documents and bid.

Do not miss the deadline or a corrigendum

Create your free account: an alert before the deadline, the buyer’s contacts and the official link. AI analysis is available with credits.

See the contacts and the official link