Topographic service for the establishment of the project of alignment stop carrying away the transferability of the land necessary for the realization of the operations that they fix relating to the construction of the first tranche of the ring road of the northeastern part of the city of SEFROU over a length of 6,6Km connecting the RN4 to the PK196+500 and the RR402 to the PK141+250 Via the track designated by SE01 and SE4
Original title: Prestation topographique pour établissement du Projet d'arrêt d'alignement emportant cessibilité des terrains nécessaires à la réalisation des opérations qu’ils fixent relatif à la construction de la première tranche de la rocade de la partie Nord-Est de la ville de SEFROU sur une longueur de 6,6Km reliant la RN4 au PK196+500 et la RR402 au PK141+250 Via la voie désignée par SE01 et SE417, conformément au plan d'aménagement des abords.
Public buyer: Provincial Director of Equipment, Transport and Logistics of Sefrou
2
days left
Closes Friday, November 27, 2026 at 09:30
Get the corrigenda and an alert before it closes.
- Publication date
- November 24, 2026
- Place of performance
- Sefrou
- Procedure
- Purchase Order
Similar tenders
- Study of project management for the realization of the corresponding development works for urban and landscape redevelopment in the mountainous areas of the province of Boulmane:
Deadline: December 17, 2026
- Topographic control of the widening and reinforcement of the rr 606 from pk 0+000 to pk 21+000 and pk 21+000 to pk 38+620
Deadline: November 26, 2026
- PRIORITY PROGRAMME OF INTERCOMMUNAL CONECTIVITY Quality control of the construction works of the track linking the RP 5127 to Ouled El Bekri via Igly south over 8,797 Km
Deadline: November 26, 2026
- Preparation of technical studies and supervision of the restoration project of medersa cherratine a fes
Deadline: December 15, 2026
- Topographical control of the construction work of two tracks under the jurisdiction of the Municipality Meknassa Acharquia: The track connecting National Road No. 29 to Douar Ould Ibria, over a length of 6 km and the track connecting National Road No. 29 to Douar Aaboud over a length of 5 km.
Deadline: November 26, 2026
- Topographic control of construction works for two tracks under the Rbaa El Fouki Commune: The track connecting Bab Nssara to Ain Batta mosque, over a length of 1536 m and the track connecting provincial road n°5414 to Douar Tawya over a length of 2589 m
Deadline: November 26, 2026
For members
Everything you need to decide and bid — in one place.
Buyer contacts
Department, email and phone of the person in charge.
Official tender link
The notice on the public portal, to get the documents and bid.
Do not miss the deadline or a corrigendum
Create your free account: an alert before the deadline, the buyer’s contacts and the official link. AI analysis is available with credits.
See the contacts and the official link