Results published🇲🇦 MoroccoWorksCivil Engineering
FOLLOWING ROUTE CONSTRUCTION WORK: -The track connecting RN 12 – ex 11- (Caidat) and douar ulad Rami over a length of 2765 ml -The track connecting RP 3612 and douar Bouzekeri over a length of 3140 ml -The track
Original title: TRAVAUX DE CONSTRUCTION DES PISTES SUIVANTE : -La piste reliant RN 12 – ex 11- (Caidat) et douar oulad Rami sur une longueur de 2765 ml -La piste reliant RP 3612 et douar Bouzekeri sur une longueur de 3140 ml -La piste
Public buyer: Municipality of Sidi Dahbi
Results published
Follow this buyer’s next tendersFree, no credit card.
- Bid submission deadline
- July 27, 2026 at 11:00 AM
- Publication date
- June 26, 2026
- Place of performance
- Settat
- Procedure
- Open tender
Similar tenders
- Completion of the construction of the runway connecting the RP3619 to the Douar Oulad Bouria Lagaada, Commune De Nkhila – Province De Settat.
Deadline: December 22, 2026
- 14 tracks over a length of 16,334 km to the different douars under the municipality of mzamza janoubia – province of settat
Deadline: December 17, 2026
- Construction works of the following engineering structures: 2 between douar doum and douar maizia commune ouled fares halla province of settat
Deadline: December 17, 2026
- Double-layer surface dressing construction works for the following tracks: - Laatamna track connecting RP 3626 and the railway (section no. 2: Pk 2+600 and Pk 3+600) over a length of 0.860 km. - Lahyout track connecting the Chammitian paved track and Fakhdate Ouled Haja over a length of 0.300 km. - Biyada track connecting the El Amra paved track and the El Haddada paved track over a length of 0.600 km. - El Haddada track connecting (section no. 2: Pk 1+500 and Pk 3+200) and Ouled Boumaizabe over a length of 1.500 km. - Hadada track connecting RP 3626 and RP 3633 over a length of 0.450 km. In the commune of Ain Dorbane-Lahlaf.
Deadline: December 23, 2026
- 15 tracks over a length of 16,575 km in the different douars under the municipality of mzamza janoubia – province of settat
Deadline: December 16, 2026
- Two-layer construction work on the following runways: - Taridat Trail connecting the Makrate tarmac runway and Fakhdate Taridate over a length of 0.214 km. - Sahbe Trail connecting the Ain tarmac runway
Deadline: December 25, 2026
For members
Buyer contacts
Department, email and phone of the person in charge.
This buyer’s next tender may be yours
Follow this buyer: you are told as soon as it publishes, with the history of its awards.
Follow this buyer’s next tenders